Laycock Constructions is a family owned and operated Construction Company servicing the
Residential and Commercial sectors. Management are committed to the safety and wellbeing of all
those involved in it’s operations.

Laycock Constructions PTY LTD is committed to enforce the Health & Safety of those who work either directly or indirectly for Laycock Construction it is of the utmost importance to Senior
Management. It is our commitment to:

  • Provide a safe and healthy working conditions for the prevention of work related injury and
    ill health
  • Fulfil our legal requirements under WHS law and any other WHS requirements
  • Eliminate hazards and reduce WHS risks
  • Continually improve our Integrated Management System
  • Consulting with workers and their representatives and encouraging their participation in the
    management system
  • In order to achieve this, the following objectives have been established:
  • Communicating this policy to all existing employees and to new employees when they
    commence with Laycock Construction
  • Incorporating risk management into all aspects of our business
  • Incorporating health and safety into our corporate governance framework
  • Complying with all Health & Safety legislation and other requirements which are relevant to Laycock Construction
  • Making our commitment to Health and Safety visible to all interested parties
  • Identifying, assessing, eliminating or controlling all potential health & safety hazards in the workplace through regular risk assessments and site safety inspections
  • Learning from our mistakes, implementing corrective & preventive actions, and continually improving our management system
  • Setting measurable objectives and targets which will be monitored to ensure continual
    improvement
  • Maintaining a Management System which meets the requirements of ISO 45001:2018
  • Promoting workforce engagement in the development and maintenance of OHS
    management systems, policy and procedure.

This policy together with the measurable objectives and targets will be reviewed on an annual basis to ensure that it remains relevant and suitable to the operations of Laycock Construction.

Addition Construction Steps

We will work with all project team members to define the logistical requirements for the construction process, such as areas for deliveries, placement of barricades (if required) and hours of operation. Donec odio. Quisque volutpat mattis eros. Nullam malesuada erat ut turpis. Suspendisse urna nibh, viverra non, semper suscipit, posuere a, pede.

Addition Construction Steps

We will work with all project team members to define the logistical requirements for the construction process, such as areas for deliveries, placement of barricades (if required) and hours of operation. Donec odio. Quisque volutpat mattis eros. Nullam malesuada erat ut turpis. Suspendisse urna nibh, viverra non, semper suscipit, posuere a, pede.

Shop Drawings and Submittals

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Cost Reporting

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Final Inspections and Occupancy Permit

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.